Natural Gas Fired CCGT Power Plant Project ALES

Updated: Jan 7, 2021

This project is located in Aydın, Turkey. It was completed and commisioned in 2012. I was the acting project and construction manager for this 63 MWe Natural Gas Fired Combined Cycle power plant.


Some of the key figures and critical items are follows;


45.000 m2 landplot

GE LM-6000 PC Sprint NG Turbine + Generator

Aalborg Heat Recovery Steam Generator

GE Thermodyn 6-7 MC9 14.150 kW Steam Turbine + Generator

SPIG Water Cooling Tower

NG PRMS Station

11.5 kV / 154 kV Grid connection works

Water treatment plants (demineralized water productio plant + pre-filtration plant)

Raw Water / Fire Water Reservoirs

Water wells

Technical and Administrative Building

Plant SCADA and DCS Systems

Plant Fire Protection Systems

Overall plant Electromechanical Balance of Plant