top of page
Writer's pictureOkan Saçlı

Natural Gas Fired CCGT Power Plant Project ALES

Updated: Jan 7, 2021

This project is located in Aydın, Turkey. It was completed and commisioned in 2012. I was the acting project and construction manager for this 63 MWe Natural Gas Fired Combined Cycle power plant.


Some of the key figures and critical items are follows;


45.000 m2 landplot

GE LM-6000 PC Sprint NG Turbine + Generator

Aalborg Heat Recovery Steam Generator

GE Thermodyn 6-7 MC9 14.150 kW Steam Turbine + Generator

SPIG Water Cooling Tower

NG PRMS Station

11.5 kV / 154 kV Grid connection works

Water treatment plants (demineralized water productio plant + pre-filtration plant)

Raw Water / Fire Water Reservoirs

Water wells

Technical and Administrative Building

Plant SCADA and DCS Systems

Plant Fire Protection Systems

Overall plant Electromechanical Balance of Plant


58 views0 comments

Comments


bottom of page