top of page
  • Writer's pictureOkan Saçlı

TIER III Data Center Project - Vakıfbank Istanbul Umraniye

Updated: Jan 7, 2021

This project is located in Umraniye - İstanbul. It was a fit out project where the car parking area located at the basement of a building was totaly knocked down and converted to a TIER III datacenter.


Total construction area, including outside genset and chiller installations were 1500m2, with a whitespace area of 365m2.


This was a turnkey project, including uptime TIER III compliant detail design, civil and architectural works, complete Electromechanical Balance of Plant, completed on an EPC basis.


Some of the installed critical DC components are ;

2 x 1500 ekW Continous Rated Diesel Gensets (provided by Caterpiller) 2 x 1000 kW Modular UPS Systems (provided by Schnedier) 2 x 1000 kW Free Cooling Chiller Systems (provided by Schneider)


Detailed photos from the project can be found under this link.


43 views0 comments
bottom of page