top of page

Mechanical Engineer by Profession, Flight Simulator Builder by Passion
I’m a mechanical engineer focused on designing efficient systems that solve real world challenges through innovation, precision, and sustainable thinking
Engineering precision, from energy and data center projects to a full-scale A320 cockpit


From aviation system models to precision mechanical builds, every project demonstrates a focus on innovation, safety, and results. Explore selected works that highlight the journey from design to execution.
.jpeg)
Search


Implementation of a 200.000 Sm3/hr capacity Natural Gas Pressure Reducing and Measurement station located in Gebze
Natural gas is one of the most important source of energy in the global energy market. It is a cleaner energy source compared to coal and oil, which makes it essential for reducing carbon emissions. Efficient management of natural gas distribution ensures safety and reliability. One of the most critical components in this process is the pressure reducing and measurement station (PRS/RMS). This blog post highlights the construction and implementation of a 200,000 Sm3/hr capaci

Okan Saçlı
Oct 8, 2025


Erzurum Customer Services Office - An Architectural Project
Another architechtural project involving civil, mechanical and electrical works in Erzurum City

Okan Saçlı
Nov 19, 2024


Bilişim Vadisi - An Architectural Design Project with infrastructure integration
The design goal was to create a unique architerctural structural combined to the SCADA system of an RMS Station (Natural gas Pressure Reducing and Mesaurement Station) located near Bilisim Vadisi (Silicon Valley of Türkiye, located near Dilovası region). The project had many challenges which were all adressed and solved accordingly. Below is a brief photo documentation of this project. The basic structure is reinforced concrete, planview dimensions are approximately 30m x 9m.

Okan Saçlı
Dec 19, 2023


Installed Power Generation Capacity of Turkey (December 2022 report)
Turkey's installed electrical power generation capacity increased up to 103.447 MWe (as of December 2022) The diversity of the generation sources can be seen in the table below. The table shows previous reports as well for comparison purposes. The percentage of thermal power generation is %46.18 and for renewable sources the percentage is %53.82. There is a visible increase in especially Solar power generation with an increase of ~%8 when compared to August 2022

Okan Saçlı
Jan 12, 2023


Installed Power Generation Capacity of Turkey (August 2022 report)
Turkey's installed electrical power generation capacity increased up to 101.737 MWe. The diversity of the sources can be seen in the table below. The table shows previous reports The percentage of thermal power generation is %47.05 and for renewable sources the percentage is %54.67. There is a visible increase in Solar and Wind power generation.

Okan Saçlı
Aug 18, 2022


Part 2/2 - Recommisiong of a 770 MWe Natural Gas Fired Powerplant - Baymina Ankara Power Plant
This is the bottom section of the HRSG, where the hot flue gases from gas turbine outlet flow through at approximately ~600oC. The coils seen above are the HP (high pressure) super heater coils. Here is a rare shot during an inspection inside the HRSG at the end point of the gas turbine (last stage turbine blades are visible) You woulnt want to be here during operation! No comments on this photo. You simply have to enter this region (when it's cool enough of course!) to reali

Okan Saçlı
Jan 21, 2022


Part 1/2 - Recommisiong of a 770 MWe Natural Gas Fired Powerplant - Baymina Ankara Power Plant
Palmet Energy Group succesfully completed the acquisition of IZGAZ Izmit City Gas Distribution and Baymina Enerji A.Ş previously owned by one of the most important energy companies in the world ”the French ENGIE group”, as of March 8, 2021. With this acquisiton ,Palmet Energy Group is growing in electricity production business. Adding Baymina Natural Gas Cycle Power Plant in Ankara to the natural gas cycle power plants in Lüleburgaz and Aydın, Palmet Energy reached a total in

Okan Saçlı
Jan 21, 2022


Installed Power Generation Capacity of Turkey (January 2022 report)
Turkey's installed electrical power generation capacity increased up to 99.431 MWe. The diversity of the sources can be seen in the table below. I have also included a comparison between my last report (October 2020) and January 2022. The percentage of thermal power generation is %46.8 and for renewable sources the percentage is %53.2

Okan Saçlı
Jan 17, 2022


Installed Power Generation Capacity of Turkey (October 2020 report)
Turkey's installed electrical power generation capacity increased up to 93.851 MWe. The diversity of the sources can be seen in the table below. The percentage of thermal power generation is %49.7 and for renewable sources the percentage is %50.3.

Okan Saçlı
Jan 15, 2021


Waste to Energy via Incineration - Part 1 - LHV analysis
One of my business development fields is the waste to energy sector. I have developed extensive know-how in waste solutions for a cleaner society for the present and the future by converting waste into renewable and sustainable energy, district heating and high quality construction materials. There are many technologies available for conversion process ; thermal, biological and landfilling processes and some of these technologies are listed / shown in the diagram below. The

Okan Saçlı
Dec 11, 2020


Gas Turbine Installation Time Lapse
Time lapse video of an engine installation. The whole procedure takes about half a day + an other half day for the setttings within the...

Okan Saçlı
Nov 27, 2020


Non-Woven and Paper Plant Factory Fire Fighting Systems in Egypt - Ain Al-Sokhna
This project is located in Ain Al-Sokhna - Egypt near the red see. This plant is the second biggest investment of our client in Egypt (The first plant is located in 6th of October near Cairo). Acting as the project manager, we designed, installed and commisioned the water based sprinkler systems (according to NFPA13), CO2 extinguishing systems, electronic detection and activation systems on an EPC basis

Okan Saçlı
Nov 24, 2020


Datacenter Project Tuzla MTX
In this success story from the past, our client purchased an old factory building (approximately 6500 m2 land plot and 5000 m2 closed area) in Tuzla region in Istanbul. The idea was to convert this old and semi demolished building into a datacenter / MTX for mobile telecomunications. The main structure of the building remained un-touched (with many structural components reinforced) and everything else was renewed (themal and water insulations, facade claddings, electrical in

Okan Saçlı
Nov 20, 2020


Fire Prevention and Suppression Project in Agbara - Nigeria
We are the main fire prevention and suppresion works contractor for the supply, design, implementation, commisioning and hand over to client's operations for ; 22 Zones of water based sprinkler systems Underground Hydrant lines and hose reel cabinets 2500 GPM Diesel + Electrical Fire Pumps CO2 based extinguishing systems for various utilities NOVEC based extinguishing systems for data center and UPS rooms on EPC basis. The project was succesfully completed and handed over the

Okan Saçlı
Nov 19, 2020


Natural Gas Fired Power Plant 62 MWe ALES
ALES power plant is located in Çine organized industrial zone , in Aydın city (located on the eagean cost of Turkey). It is a combined cycle natural gas fired power plant with a power output capacity of 62 MWe. The project was completed in two phases ; the simple cycle was comissionined in December 2012 and the combined cycle was comissioned in April 2013 and it is in commercial operation since then. The gas turbined is a GE LM6000 PC type, combined with an Aalborg type HRSG

Okan Saçlı
Nov 13, 2020


GE LM6000 (CF6-80C2) Gas Turbine - Part I
The GE (General Electric) LM6000 is a turboshaft aeroderivative gas turbine engine. The LM6000 is derived from the CF6-80C2 aircraft turbofan which is used in Boeing 747-400, McDonnell Douglas MD-11, Airbus A300 and Airbus A310 type airplanes. The declared performance data (as provided and published by GE) can be seen in the table below. For simple cycle operations; and for combined cycle in 1+1 configuration (ie. a single gas turbine + a single steam turbine) as follows, All

Okan Saçlı
Nov 10, 2020


Fire Fighting and Prevention Project - Pakistan Faysalabad
This fire fighting project is located in Faysalabad - Pakistan. This plant is the first investment of Hayat Group in Pakistan. Acting as the project manager we completed the installation and commisioing of the water based sprinkler systems (according to NFPA13), foam based extinguishing systems, CO2 based extinguishing systems with local applications, electronic fire detection and activation systems, underground hydrant lines and hose reel cabinet systems on a turnkey EPC bas

Okan Saçlı
Oct 20, 2020


Natural Gas Pressure Reduction Station (PRS) project completed
The PRS (pressure reduction station) for the Canadian gas grid is completed successfully in Gebze workshop in Turkey. As reported previously, the design maximum inlet pressure is 99.3 bars and the station outlet pressure is set at 5.5 bars range. The special design containerized, flexible PRS solution was done by Palmet group and the design was approved by Petra engineering of Canada (design according to CSA) The container was designed in such a way to work extreme low temper

Okan Saçlı
Feb 20, 2020


Natural Gas Pressure Reduction Station (PRS) for the Canadian gas grid
We are currently manufacting a PRS (Natural gas pressure reduction station) which will have a maximum inlet pressure of 99.3 bars and an outlet pressure of 5.5 bars to be used in the Canadian gas grid. It will be a containerized flexible design which will be shipped from Turkey to Canada in a built package configuration. The design of the PRS (both the mechanical skid and the container) was done inhouse by Palmet Group and was approved and stamped by Petra Engineering of Cana

Okan Saçlı
Jan 21, 2020


Data Center Air-to-Air Cooling (20 x 150 kW) Project Completed
The project for the installation, commisioning and heat load testing for 20 nos. of 150 kW air-to-air cooling system (total of 3 MW cooling) has been successfully completed. The project is located in Ankara, Turkey in Kredi Kayıt Bürosu Tier4 datacenter. Palmet Engineering was the main contractor on an EPC basis of the complete phase-I of this huge datacenter complex. In phase one we have already installed 20 nos. of 150 kW cooling system for white space 1 and whitespace 2. T

Okan Saçlı
Aug 8, 2019
bottom of page